Skip to content

Start with a 2–3 week feasibility analysis

Three steps from pilot to production. Each ends with a tangible result and a decision, so you only ever commit to the next step.

  1. 2–3 weeks Start here

    Feasibility Analysis
  2. 6–10 weeks

    Prototype Sprint
  3. ongoing

    Dedicated Team

2–3 weeks

Feasibility Analysis

Answers one question before you invest: can your task run on the target hardware, at the speed and accuracy you need?

The question
Which Jetson module, carrier board and sensor? Can your model reach the frame rate and accuracy you need on that hardware? What changes in your architecture when inference moves from the cloud onto the device?
What we do
  • Hardware evaluation and platform recommendation: Jetson module, industrial carrier board, sensor
  • Benchmark of your model on the target hardware, with your data
  • Architecture for on-device processing and the boundary to your cloud
  • Risks, effort and a roadmap for the prototype
What it rests on
The same questions decided the reference system: Jetson Orin NX, an industrial carrier board and a low-light sensor, chosen for months of unattended operation. Case study: hardware platform

6–10 weeks

Prototype Sprint

A working system on the hardware you will ship, measured under field conditions. Not a demo you throw away, but the base for series production.

The question
A model that runs on a dev kit often misses its frame rate on the target device, and the integration with your systems is still open.
What we do
  • Development directly on the target hardware
  • Model training on your data and optimization for the target hardware
  • Inference pipeline with DeepStream and TensorRT INT8
  • Integration with your systems and data infrastructure
  • Performance measured under realistic field conditions
What it rests on
In the reference system this pipeline runs at 30+ FPS with under 200 ms from camera to result on a Jetson Orin NX. Case study: inference pipeline

ongoing

Dedicated Team

From a validated prototype to a fleet in the field, and keeping it running: production hardening, rollout and operations.

The question
Going from one prototype to hundreds of devices needs a custom operating system, security hardening, OTA updates and fleet monitoring. This is the 80% where most edge AI projects stall.
What we do
  • Custom Yocto distribution instead of developer Ubuntu
  • Security hardening: secure boot chain, mutual TLS, no inbound SSH
  • OTA updates for firmware and models
  • Fleet operation: device inventory, health monitoring, remote diagnostics, remote access and automatic recovery
What it rests on
The reference fleet: 300+ units, 30+ days unattended, automatic recovery in under 5 minutes, OTA updates in under 15 minutes. Case study: operations

Talk to an engineer, not a sales team

30 minutes with an engineer. Bring your hardware, your task and your timeline; a dev-kit demo or sample footage helps.

Request a 30-minute technical call

Free and without obligation. We reply within 24 hours.

Gaylord Aulke

Head of Technology

+49 (0) 711 46059540
[email protected]